Resource center

Business internet renewal calculator

Know when to act and what each option costs. Plan around your contract notice deadline, installation and time to test the new connection.

An example plan

Start planning
Jan 31, 2027
Estimated notice deadline
Mar 1, 2027
Contract ends
Apr 30, 2027

A lower monthly quote can cost more once you include installation and the time both services run.

What should I check before renewing business internet?

Find the current term end date, the required notice and delivery method, and what happens if you take no action. Then compare the full costs of equivalent services over the same period and confirm when a new service can be installed and tested.

Worked example and calculations

Suppose the contract ends April 30, 2027, with 60 calendar days’ notice. The estimated notice date is March 1. If installation could take 75 days and you want 14 days to test the new connection, the planning date to start the switch is January 31 and the installation target is April 16.

A $260 monthly renewal totals $6,240 over 24 months. A $230 monthly alternative plus $900 in transition costs totals $6,420. In this illustrative example, the renewal costs $180 less over the same period.

The planner counts back in calendar days. Your agreement governs the actual deadline. Quote totals include the monthly average multiplied by the number of months, plus net upfront costs.

Before you sign or disconnect

  1. Confirm the notice deadline and submission method against the agreement and any amendments.
  2. Compare speed in both directions, service commitments, static IPs, equipment, and support.
  3. Check installation and construction in writing. Test payment systems, phones and failover before disconnecting the old service.
  4. Repeat the plan for each service address. A second location can have a different notice window, install lead time or backup path.

Bring your written quotes to a FreeTEM advisor, or check options at your business address.